iteration-10/5

Violin Plot

Violin Plot

This chart shows the relationship between function/parameter and iteration time. The thickness of the shaded region indicates the probability that a measurement of the given function/parameter would take a particular length of time.

iteration-10/vec-aos-cold/5

PDF of Slope Regression

iteration-10/vec-aos-warm/5

PDF of Slope Regression

iteration-10/vec-soa-cold/5

PDF of Slope Regression

iteration-10/vec-soa-warm/5

PDF of Slope Regression

iteration-10/specs-cold/5

PDF of Slope Regression

iteration-10/specs-warm/5

PDF of Slope Regression

iteration-10/legion-warm/5

PDF of Slope Regression

iteration-10/legion-cold/5

PDF of Slope Regression